I applied online. The process took 3 weeks. I interviewed at Zimmer Biomet (Warsaw, IN) in Sep 2022
Interview
1.) Phone call with engineering manager
2.) On-site interview was scheduled two weeks after the phone screen
3.) 4 hour on-site interview to meet with the team and continue the interview with multiple managers
4.) left interview, had a good feeling about it.
5.) Rejected 2 weeks later!
I applied through a recruiter. The process took 2 weeks. I interviewed at Zimmer Biomet (Jacksonville, FL) in Feb 2022
Interview
Got reached out by a recruiter and then had a 30 minute interview with the department manager. As recruiters usually do, I got ghosted even after trying to reach out twice.
Interview questions [1]
Question 1
What is your experience with design documentation?
I applied online. The process took 4 weeks. I interviewed at Zimmer Biomet (Warsaw, IN) in Apr 2018
Interview
The interview process was broken into approximately 4 separate interviews.
HR Interview - 30ish mins
Engineering Team Interview - Usually 2-3 team members - 30ish mins
Second Set Team Interview - 2-3 team members -30ish mins
Manager Interview - 15-30ish mins
Interview questions [1]
Question 1
Simple Engineering concept questions - Beam Loading, manufacturing processes, force diagrams.
Engineering situational question - Broach handle has complaints about loose connection. Walk through how to address issue.
Managerial preferential/behavioral questions - Time you competed, Time you failed, Time you overcame difficulties.
Resume questions - Tell me about A, B, C in your experience.
Inspiration style question - why this position, why this company, what drives/motivates/frustrates you