Manager Director Interview Questions

713,245 manager director interview questions shared by candidates

Behavioral based questions were easy to prepare for. Amazon prefers the STAR (situation, task, action, result) method to answer. Would suggestion preparing for the math flow question. I was asked the following: You have 30 associates who all work an 8 hour day, 5 days a week. 2 need to be in indirect (non-volume producing) roles. Your direct (production) rate is 150 units per hour, but you have two 15-minute breaks during the day. How many units can your department produce in a 40 hour week?
avatar

Operations Manager

Interviewed at Amazon

3.5
Aug 20, 2013

Behavioral based questions were easy to prepare for. Amazon prefers the STAR (situation, task, action, result) method to answer. Would suggestion preparing for the math flow question. I was asked the following: You have 30 associates who all work an 8 hour day, 5 days a week. 2 need to be in indirect (non-volume producing) roles. Your direct (production) rate is 150 units per hour, but you have two 15-minute breaks during the day. How many units can your department produce in a 40 hour week?

* Given an array of numbers. Create another array that contains * the product of all the members in the array except the current * element. For example, if you have an array of 3 elements such as: * * A[0] = 2 * A[1] = 4 * A[2] = 6 * * Then the resulting array will be * B[0] = 24 * B[1] = 12 * B[2] = 8 *
avatar

Technical Account Manager

Interviewed at Google

4.4
Jan 11, 2011

* Given an array of numbers. Create another array that contains * the product of all the members in the array except the current * element. For example, if you have an array of 3 elements such as: * * A[0] = 2 * A[1] = 4 * A[2] = 6 * * Then the resulting array will be * B[0] = 24 * B[1] = 12 * B[2] = 8 *

You have 25 laborers for a shift. Pickers pick 100 units an hour Small item packers pack 150 units an hour Large item packers pack 25 units an hour You must pack 7500 small units during a ten hour shift. How would you staff your shift?
avatar

Area Manager

Interviewed at Amazon

3.5
Sep 17, 2009

You have 25 laborers for a shift. Pickers pick 100 units an hour Small item packers pack 150 units an hour Large item packers pack 25 units an hour You must pack 7500 small units during a ten hour shift. How would you staff your shift?

Viewing 61 - 70 interview questions

Glassdoor has 713,245 interview questions and reports from Manager director interviews. Prepare for your interview. Get hired. Love your job.