The telephone interview was ok. Had a decent video call interview with the engineering manager in the US. The following Loop interview was poorly scheduled. one of the loop calls in the afternoon at 12PM. the other four loop calls were in the evening ranging from 6-11.30PM, as all the reminder of the interviewers were from all over the US.
Interview questions [1]
Question 1
How to arrange a cupboard inside the kitchen based on simple logic.